Parts, equipment & maintenance

Every critical part carries its own history with it.

A part without its file is just an object. The solution links the part, its conformity documents, the equipment receiving it and the intervention that fitted it.

Dedicated solution

The problem

The part and its file do not travel together

Documents sit in a binder or a mailbox, the part sits in the store, and the intervention sits in a logbook.

Documents have to be hunted down

Finding the conformity document of a part fitted two years ago means knowing who received it.

Equipment history is incomplete

What was fitted, when and by whom is reconstructed from memory — precisely what an audit will not accept.

Non-conformities are handled outside the system

A part set aside, a waiver granted: the decision exists, its trace far less so.

What the solution covers

The part, its file, its equipment and its intervention

Four objects that did not talk to each other, linked by the same chain.

Parts, lots and serial numbers

A critical part is identified individually, not merely counted within a reference.

Attached conformity documents

The supplier document stays attached to the part and stays findable from it — no mailbox archaeology.

Equipment

Each piece of equipment carries its history: what was fitted, replaced, checked.

Interventions and tasks

An intervention becomes an assigned task, with a due date and proof of completion.

Non-conformities and waivers

A rejection blocks, a waiver unblocks — and both leave a trace with their reason and their author.

Genealogy

You go from equipment to the parts it contains, and from a part to the equipment it went into.

The journey

From part receipt to equipment history

Nothing is lost between the four stages.

  1. 1

    Receipt

    The part arrives with its identifier and its supplier documents attached.

  2. 2

    Check

    Conform, rejected or under waiver — the decision is recorded with its reason.

  3. 3

    Intervention

    The part is fitted to equipment within an assigned, dated task.

  4. 4

    History

    The equipment now carries the part, its documents and the intervention that fitted it.

Optional, piloted or not activated

What the solution does not do — and does not claim to

The distinction matters, especially in this sector.

  • No sector approval is claimed. Qasax structures and preserves the trace; it issues no attestation.
  • Onboarding is guided: we configure the sector with you rather than leaving you in front of an empty setup.
  • RFID reading is not operational — approval not obtained, no movement triggered by a radio event.
  • Inspection plans and part reference data are configured with us.

Product demo

See its own history in action

~1 minFRPreview — under review

A part without its file is just an object. The solution links the part, its conformity documents, the equipment receiving it and the intervention that fitted it.

Video in preparation

This walkthrough is being recorded and reviewed. In the meantime, request a private demo tailored to your operations.

Let’s talk about your critical parts

A demo is prepared around your equipment and your documentation requirements.